subject
Engineering, 25.05.2021 01:00 Casmereee

Please help fast which of the following are listed in most company guidelines as appropriate drawing to created by engineers?

a. assembly drawings
b. detail drawings
c. schematic drawings
d. all of the above ​

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 19:10
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
question
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
You know the right answer?
Please help fast which of the following are listed in most company guidelines as appropriate drawin...
Questions
question
Arts, 15.04.2020 00:05
question
Mathematics, 15.04.2020 00:06
question
Mathematics, 15.04.2020 00:06