subject
Mathematics, 27.05.2021 20:00 fishesforever2321

Consider the following project network applying PERT/CPM as described, where the number over each through this network from start to finish, since the longest path is node is the time required for the corresponding activity. Consider the problem of finding the longest path (the largest total time) the critical path.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Find the value of tan theta if sin theta = 12/13 and theta is in quadrant 2
Answers: 1
question
Mathematics, 21.06.2019 15:30
Turner's mom measured his room to see how long the wallpaper border needed to be. if two walls are 15 feet long and two walls are 12 feet long, how long should the strip of border be cut?
Answers: 1
question
Mathematics, 21.06.2019 16:40
Which of the following is the correct equation for this function? a. y= (x+4)(x+2) b. y=x^2+ 3x – 2 c. y+ 2 = – 2(x+3)^2 d. y+ 2 = 2(x+3)^2
Answers: 1
question
Mathematics, 21.06.2019 20:00
Given the graphed function below which of the following orders pairs are found on the inverse function
Answers: 1
You know the right answer?
Consider the following project network applying PERT/CPM as described, where the number over each th...
Questions
question
Biology, 16.10.2019 04:00
question
English, 16.10.2019 04:00