subject
Mathematics, 19.10.2020 14:01 Kriszzznizzle

An offshore wind turbine is 3km off the shoreline. The power operator is 7 km down the coast to the east of the turbine. For the electricity generated by the turbine to make its way to the power operator, the turbine must be connected to distribution lines and then to the network transmission lines located at the power operator. If laying the distribution lines cost twice times as much under water as it does on land, what path should the distribution lines follow in order to minimize the cost?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Solve the triangle. a = 21°, c = 105°, c = 5
Answers: 2
question
Mathematics, 21.06.2019 21:10
Determine the solution for mc001-1.jpeg
Answers: 1
question
Mathematics, 21.06.2019 21:30
Two airplanes start at the same place and travel in opposite directions,one at 395 miles per hour and the other at 422 miles per hour. how many hours will it take for the planes to be 2451 miles apart?
Answers: 1
question
Mathematics, 22.06.2019 00:30
Ineed to find the answer to number 2
Answers: 2
You know the right answer?
An offshore wind turbine is 3km off the shoreline. The power operator is 7 km down the coast to the...
Questions
question
Mathematics, 02.01.2020 22:31
question
History, 02.01.2020 22:31
question
Mathematics, 02.01.2020 22:31
question
Mathematics, 02.01.2020 22:31