subject
Mathematics, 06.05.2020 18:03 mal5546

Paul can install a 300 square foot floor in 18 hours. Matt can install the same floor in 22 hours. How long would it take paul and matt to install the floor working together?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
What is the value of x in the diagram below?
Answers: 2
question
Mathematics, 21.06.2019 16:30
Answer the following for 896.31 cm= km 100cm = 1m 1000m = 1km a) 0.0089631 b) 0.0089631 c) 8.9631 d) 89.631
Answers: 1
question
Mathematics, 21.06.2019 17:00
Two streets intersect at a 30- degree angle. at the intersection, the are four crosswalks formed that are the same length. what type of quadrilateral is formed by the crosswalks?
Answers: 2
question
Mathematics, 21.06.2019 21:10
Identify the initial amount a and the growth factor b in the exponential function. a(x)=680*4.3^x
Answers: 2
You know the right answer?
Paul can install a 300 square foot floor in 18 hours. Matt can install the same floor in 22 hours. H...
Questions
question
Spanish, 18.11.2019 07:31
question
Social Studies, 18.11.2019 07:31
question
Spanish, 18.11.2019 07:31