A product that is very labor intensive assembled at Boyds Aero Structure in Memphis has an average labor cost of $20/hr. Overhead expenses are charged at 100% of labor at this company. Time for the very first unit = 10 hours Time for the fourth unit = 8.1 hours The learning curve percentage for this operation is ?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
What’s the ratio in simplest form if you count 14 robins out of 150 birds
Answers: 1
question
Mathematics, 21.06.2019 16:00
Answer asap ! the shortest path from point a to point b goes through a pond. to avoid the pond, you must walk straight 34 meters along one edge of the pond, then take a 90 degree turn, and again walk straight 41 meters along another edge of the pond to reach point b. about how many meters would be saved if it were possible to walk through the pond? a. 11 m b. 20 m c. 30.45 m d. 21.73 m
Answers: 1
question
Mathematics, 22.06.2019 00:00
Which of the following statements are true about the graph of f (x) = 1/4 coz ( x + π/3) - 1? select two of the following that apply.
Answers: 1
question
Mathematics, 22.06.2019 08:00
The graph represents the function f(x) = 10(2)x.
Answers: 3
You know the right answer?
A product that is very labor intensive assembled at Boyds Aero Structure in Memphis has an average l...
Questions
question
Mathematics, 11.03.2020 00:05
question
English, 11.03.2020 00:05
question
Mathematics, 11.03.2020 00:06
question
Mathematics, 11.03.2020 00:07