subject
Mathematics, 18.01.2020 00:31 kam110800

Matt is a software engineer writing a script involving 6 tasks. each must be done one after the other. let ti be the time for the ith task. these times have a certain structure:

•any 3 adjacent tasks will take half as long as the next two tasks.

•the second task takes 1 second.

•the fourth task takes 10 seconds.

a) write an augmented matrix for the system of equations describing the length of each task.

b) reduce this augmented matrix to reduced echelon form.

c) suppose he knows additionally that the sixth task takes 20 seconds and the first three tasks will run in 50 seconds. write the extra rows that you would add to your answer in b) to take account of this new information.

d) solve the system of equations in c).

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
On a piece of paper graph f(x)=5•(0.4)^x
Answers: 1
question
Mathematics, 21.06.2019 16:20
Two lines parallel to the same plane are parallel to eachother
Answers: 1
question
Mathematics, 21.06.2019 17:30
Which is the equation of a line perpendicular to the line with the equation 3x+4y=8
Answers: 1
question
Mathematics, 21.06.2019 17:30
Someone this asap for a group of students attends a basketball game. * the group buys x hot dogs at the concession stand for $2 each. * the group buys y drinks at the concession stand for $3 each. the group buys 29 items at the concession stand for a total of $70. how many hot dogs did the group buy?
Answers: 2
You know the right answer?
Matt is a software engineer writing a script involving 6 tasks. each must be done one after the othe...
Questions
question
Physics, 21.06.2020 05:57