subject
Mathematics, 20.09.2019 02:10 Ksedro1998

The dulac box plant produces 500 cypress packing boxes in two-10 hour shifts. due to higher demand, dulac has decided to operate three eight-hour shifts instead. dulac is now able to produce 600 boxes per day. what has happened to production:
a. it has increased by 50 sets/shift
b. it has increased by 20 percent
c. it has increased by 37.5 sets/hr
d. it has decreased by 8.3 percent
e. it has decreased by 9.1 percent.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Which is the equation of a line perpendicular to the line with the equation 3x+4y=8
Answers: 1
question
Mathematics, 21.06.2019 20:30
Laura read 1/8 of a comic book in 2 days. she reads the same number of pages every day. what part of the book does she read in a week
Answers: 1
question
Mathematics, 22.06.2019 00:00
This circle is centered at the origin, and the length of its radius is 6. what is the circle's equation? a. x^2+y^2=36 b x^2+y^2=6 c x+y=36 d x^6+y^6=1
Answers: 2
question
Mathematics, 22.06.2019 00:00
Question 6(multiple choice worth 5 points) (05.02 lc) what is the value of x? a right angle is shown divided into two parts. the measure of one part of the right angle is 10 degrees. the measure of the other part is 2x 20 40 45 85
Answers: 1
You know the right answer?
The dulac box plant produces 500 cypress packing boxes in two-10 hour shifts. due to higher demand,...
Questions
question
History, 30.01.2020 12:52