5.14 Vehicles begin to arrive at a park entrance at 7:45 A. M. at a constant rate of six per minute and at a
constant rate of four vehicles per minute from 8:00 A. M.
on. The park opens at 8:00 A. M. and the manager wants
to set the departure rate so that the average delay per
vehicle is no greater than 9 minutes (measured from the
time of the first arrival until the total queue clears).
Assuming D/D/1 queuing, what is the minimum
departure rate needed to achieve this?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
5.14 Vehicles begin to arrive at a park entrance at 7:45 A. M. at a constant rate of six per minut...
Questions
question
Mathematics, 24.06.2021 08:50
question
Mathematics, 24.06.2021 08:50
question
Mathematics, 24.06.2021 08:50