Which two questions can be used to identify time and cost constraints on the design of a heavy industrial machine?
O A. Does it move the payload at 5.0 m/s?
B. Can it be completed within 120 days?
C. Will it cost less than $10,000?
D. Can it carry a load of 45,000 kg?
E. Does it have visual appeal for the public?

ansver
Answers: 3

Another question on Chemistry

question
Chemistry, 22.06.2019 13:00
If two objects at different te,peraure are in contact with each other what happens to their temperature
Answers: 1
question
Chemistry, 22.06.2019 14:30
Calculate the mass of carbon in 97.0 g of sucrose c12h22o11
Answers: 3
question
Chemistry, 22.06.2019 20:00
I’m an electrically neutral atomic any element, there are equal numbers of
Answers: 2
question
Chemistry, 22.06.2019 21:30
How many oxygen atoms are there in 3.15 moles of hcl manganese (iv) oxide, mno2
Answers: 2
You know the right answer?
Which two questions can be used to identify time and cost constraints on the design of a heavy indu...
Questions
question
Mathematics, 03.06.2021 14:00
question
Biology, 03.06.2021 14:00
question
Biology, 03.06.2021 14:00
question
Mathematics, 03.06.2021 14:00