The average wind velocity in a particular area is found to be 5.5m/s. It is proposed to install a wind driven turbine with a blade radius of 1.8m. The

proposed design has an interference factor of 0.21 and a torque coefficient of 0.8.

Determine:

a) The expected power output of the turbine.

b) Thrust on the turbine.

c) Torque on the turbine.

d) Rotational speed.

Note: Assuming the air density is 1.2 kg/m3​


The average wind velocity in a particular area is found to be 5.5m/s. It is

proposed to install a

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 19:10
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
You know the right answer?
The average wind velocity in a particular area is found to be 5.5m/s. It is proposed to install a w...
Questions
question
English, 06.07.2019 13:40
question
Computers and Technology, 06.07.2019 13:40
question
Geography, 06.07.2019 13:40
question
Biology, 06.07.2019 13:40