subject
Engineering, 22.03.2021 22:40 Crxymia

c) Estimate the activity duration if the contractor decides to excavate the layer by drilling and blasting. The site is 200 ft by 400 ft and must be excavated to an average depth of 14 ft. Trial blasting indicates that 3 in holes drilled in a 10 ft rectangular pattern will provide the desired fracturing. A hole depth of 16 ft must be drilled to yield a 14 ft effective depth. The average drilling and blasting rate is estimated to be 200 ft/hr.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
c) Estimate the activity duration if the contractor decides to excavate the layer by drilling and bl...
Questions
question
Mathematics, 10.11.2019 16:31