subject
Engineering, 26.08.2020 17:01 isabellesmith51317

If a scope's sweep time control is set for 5 mS and the displayed signal covers four divisions to make one full waveform, what is the total elapsed time of one cycle? A. 40mS
B. 20mS
C. 5mS
D. 10mS

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
You know the right answer?
If a scope's sweep time control is set for 5 mS and the displayed signal covers four divisions to ma...
Questions
question
Mathematics, 18.11.2019 09:31
question
Health, 18.11.2019 09:31
question
English, 18.11.2019 09:31
question
Mathematics, 18.11.2019 09:31
question
Mathematics, 18.11.2019 09:31