subject
Engineering, 07.06.2020 11:57 baby092000

A process is in control with mean 50 and standard deviation of 2. The upper specification limit for the product being produced is 60 and the lower specification limit is 42. What is the value of Cpk?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12Β°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
A process is in control with mean 50 and standard deviation of 2. The upper specification limit for...
Questions
question
Social Studies, 24.04.2020 00:58
question
Mathematics, 24.04.2020 00:58
question
Mathematics, 24.04.2020 00:58
question
Mathematics, 24.04.2020 00:58
question
Social Studies, 24.04.2020 00:58