subject
Engineering, 15.04.2020 05:21 raemyiajackson1

A 7.5 in. thick concrete slab is placed on the ground. The maximum aggregate size of coarse aggregate in the concrete mix is 1.5 in. Concrete slump is 5 in. What is the maximum spacing of control/contraction joint recommended for this slab? If concrete slump is measured as 3 inches, what spacing would you suggest for the control joints?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:20
Acompressor compresses a gas, a pump compresses a liquid. for a given pressure ratio, why does it take more work to compress a gas in a compressor than a liquid in a pump? a)- for a given pressure ratio the average specific volume for a gas is much higher than the average specific volume for a liquid. b)- there is no difference. the only difference is the amount of heat generated (not work) c)- for a given pressure ratio the average volurge for a gas is much higher than the average volume for a liquid. d)-there is no difference
Answers: 3
question
Engineering, 06.07.2019 02:30
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
A 7.5 in. thick concrete slab is placed on the ground. The maximum aggregate size of coarse aggregat...
Questions