subject
Engineering, 05.03.2020 23:41 Elliewop

A crest vertical curve connects a +4.90 percent grade and a -1.85 percent grade. The PVI is at station 77+00.00 at an elevation of 770.00 ft. The design speed is 60 mi/h. Determine: a. The length of the vertical curve using the AASHTO method ("K" factors) b. The station of the BVC c. The elevation of the BVC d. The station of the EVC e. The elevation of the EVC f. The station of the high point g. The elevation of the high point h. The elevation of station 75+30.00 Also, provide a tabulation showing the elevations at each full station on the curve, including the distance from the PVC for each full station, the elevation on initial tangent, the offset, and the elevation on the vertical curve.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
You know the right answer?
A crest vertical curve connects a +4.90 percent grade and a -1.85 percent grade. The PVI is at stati...
Questions
question
Mathematics, 27.07.2019 20:30
question
Mathematics, 27.07.2019 20:30
question
Social Studies, 27.07.2019 20:30