subject
Engineering, 27.12.2019 07:31 lishalarrickougdzr

How many tons of coarse aggregate will be required to fill a trench 8 foot deep, 5 foot wide, and 675 feet long. the coarse aggregate unit weight is 95.2lb/cft? the owner is concerned th install lightweight aggregate, with a unit weight of 55.0 lb/cft. how many yards of lightweight aggregate are required? if each dump truck holds 18cy and the maximum carrying capacity 50,000 lbs, calculate how many loads each stone will require to fill the trench at the weight of the aggregate may affect a nearby foundation and has asked to

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:20
Describe one experiment in which the glass transition temperature and melting temperature of a totally amorphous thermoplastic material can be determined. show the relevant experimental results in a diagram which should be properly annotated with the two temperatures clearly marked. what is likely to happen to the curve in the diagram if the amorphous polymer is replaced by a thermosetting type?
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 03:10
List and describe the parts of boxford cnc milling machine with pictures?
Answers: 2
You know the right answer?
How many tons of coarse aggregate will be required to fill a trench 8 foot deep, 5 foot wide, and 67...
Questions
question
Mathematics, 12.08.2020 05:01
question
French, 12.08.2020 05:01
question
Mathematics, 12.08.2020 05:01