subject
Engineering, 20.12.2019 18:31 ineedhelpireallydo

You are in alaska where it is cold; so you are pumping unused engine oil through a pre-heater in the shop before it flows into your equipment. the oil is flowing at a mass flow rate of 0.500 kg/sec through a 2.50 cm diameter tube (assume it is a "smooth tube") that is 20.0 m long. the inlet temperature of the oil is 10.0°c; and the constant surface temperature of the tube is 85.0°c.
1. calculate the following:
a) the outlet temperature of the oil.
b) the heat transfer rate.
c) the pumping power required.
d) provide comments (1-2 paragraphs) on the feasibility of doing this; would you recommend something to improve this process?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
You know the right answer?
You are in alaska where it is cold; so you are pumping unused engine oil through a pre-heater in th...
Questions
question
Mathematics, 31.08.2019 20:50