subject
Engineering, 09.11.2019 03:31 babyduckies37

Assume you have the following jobs to execute with one processor: give the average wait time for this set of processes using the following algorithms. specify the arbitration rule used for each algorithm, if needed. (a) first in first out (b) shortest job next (non-preemptive) (c) shortest remaining time next (pre-emptive) (d) round robin, with a quantum of 7 (e) round robin, with a quantum of 5 plus context switch time of 1

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
You know the right answer?
Assume you have the following jobs to execute with one processor: give the average wait time for th...
Questions
question
Mathematics, 30.07.2021 18:30
question
English, 30.07.2021 18:30
question
History, 30.07.2021 18:30
question
Mathematics, 30.07.2021 18:30