subject
Engineering, 20.08.2019 18:30 twistedgamerhd12

A60 v dc wind turbine is hooked up to charge a battery bank consisting of four 15 v batteries in series. the wind is not blowing, but the batteries must supply 2 loads. one is a light bulb, rated at 250 w at 60 v; the other is a heater which is rated at 2,000 w at 60 v. the loads are in parallel. the batteries may be considered to be constant 15 v voltage sources, with an internal series resistance of 0.05 ohm each a) find i) the resistance of each load and ii) the total resistance b) how much power is actually supplied to the loads? how does that power compare to that which is expected? c) how much power is lost in the internal resistance of the batteries? what fraction is this of the total power coming from the batteries? (ignore the effect of temperature on resistance of filament and heating elements.)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
A60 v dc wind turbine is hooked up to charge a battery bank consisting of four 15 v batteries in ser...
Questions
question
Mathematics, 17.10.2019 10:30