An embankment construction requires the delivery of 38,200 m3 of the soil from a stockpile (d= 87 pcf, w=13%) to the construction site. the moisture content of the soil at the construction site is 9%. the compactors specifications indicate that the soil needs to be compacted to a minimum of 90% of modified proctor maximum dry unit weight. laboratory compaction tests yielded a maximum dry unit weight of 116 pcf. how much water (in cubic feet) must be added to the soil to increase its moisture content to the optimum moisture content of 14%

ansver
Answers: 1

Another question on Chemistry

question
Chemistry, 21.06.2019 19:30
Which answer lists the fundamental forces in order from strongest to weakest
Answers: 1
question
Chemistry, 22.06.2019 04:00
What layer of the atmosphere is directly above the troposphere?
Answers: 1
question
Chemistry, 22.06.2019 07:30
11. phosphorus-32 is radioactive and has a half life of 14 days. how much of a 124 mg sample of phosphorus-32 is present after 56 days? a) 7.75 mg b) 15.5 mg c) 31.0 mg d) 62.0 mg
Answers: 3
question
Chemistry, 22.06.2019 08:40
Write the formula for the following chemicals. 7. e. trinitrogen tetraoxide a calcium phosphate f. magnesium acetate b. potassium sulfide g nickel(iii) cyanide c carbon dioxide h. silver sulfate d. cobalt(ii) chloride
Answers: 1
You know the right answer?
An embankment construction requires the delivery of 38,200 m3 of the soil from a stockpile (d= 87 p...
Questions
question
Mathematics, 29.11.2019 17:31
question
Mathematics, 29.11.2019 17:31
question
Mathematics, 29.11.2019 17:31
question
Biology, 29.11.2019 17:31