subject
Business, 17.04.2020 22:37 emilylittle2442

Loise Inc., a manufacturing company, forecasts that total overhead for the current year will be $19,250,000, and total machine hours will be 350,000 hours. However, the actual overhead is $6,095,000, and the actual machine hours are 142,000 hours.
If the company uses a predetermined overhead rate based on machine hours for applying overhead, what is the predetermined overhead rate?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 11:10
Which of the following is an example of a production quota? a. the government sets an upper limit on the quantity that each dairy farmer can produce. b. the government sets a price floor in the market for dairy products. c. the government sets a lower limit on the quantity that each dairy farmer can produce. d. the government guarantees to buy a specified quantity of dairy products from farmers.
Answers: 2
question
Business, 22.06.2019 15:10
Popeye produces 20 cans of spinach in 8 hours. wimpy produces 15 hamburgers in 10 hours. if each hamburger trades for 1.5 cans of spinach, then: a.wimpy’s production and productivity are greater than popeye’s. b.popeye’s production is greater than wimpy’s, but his productivity is less. c.wimpy’s production is greater than popeye’s, but his productivity is less. d.popeye’s production and productivity are greater than wimpy’s.
Answers: 3
question
Business, 22.06.2019 15:20
Sauer food company has decided to buy a new computer system with an expected life of three years. the cost is $440,000. the company can borrow $440,000 for three years at 14 percent annual interest or for one year at 12 percent annual interest. assume interest is paid in full at the end of each year. a. how much would sauer food company save in interest over the three-year life of the computer system if the one-year loan is utilized and the loan is rolled over (reborrowed) each year at the same 12 percent rate? compare this to the 14 percent three-year loan.
Answers: 3
question
Business, 23.06.2019 02:20
Speedy auto repairs uses a job-order costing system. the company’s direct materials consist of replacement parts installed in customer vehicles, and its direct labor consists of the mechanics’ hourly wages. speedy’s overhead costs include various items, such as the shop manager’s salary, depreciation of equipment, utilities, insurance, and magazine subscriptions and refreshments for the waiting room. the company applies all of its overhead costs to jobs based on direct labor-hours. at the beginning of the year, it made the following estimates: direct labor-hours required to support estimated output 20,000 fixed overhead cost $ 350,000 variable overhead cost per direct labor-hour $ 1.00 required: 1. compute the predetermined overhead rate. 2. during the year, mr. wilkes brought in his vehicle to replace his brakes, spark plugs, and tires. the following information was available with respect to his job: direct materials $ 590 direct labor cost $ 109 direct labor-hours used 6
Answers: 1
You know the right answer?
Loise Inc., a manufacturing company, forecasts that total overhead for the current year will be $19,...
Questions