Which of the following costs would a computer manufacturer include in manufacturing overhead? a. The cost of the disk drives. b. The wages earned by computer assemblers. c. The cost of the memory chips. d. Depreciation on testing equipment.

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 05:00
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
question
Business, 22.06.2019 19:00
Adrawback of short-term contracting as an alternative to making a component in-house is thata. it is the most-integrated alternative to performing an activity so the principal company has no control over the agent. b. the supplying firm has no incentive to make any transaction-specific investments to increase performance or quality. c. it fails to allow a long planning period that individual market transactions provide. d. the buying firm cannot demand lower prices due to the lack of a competitive bidding process.
Answers: 2
question
Business, 22.06.2019 22:00
Acontractor was awarded a purchase order for commercial items for $1.5 million under the authority of far subpart 13.5. the purchase order was issued in november 2010 and containedall applicable clauses that were current as of the date of the purchase order. under the purchase order, the contractor is required to comply with a small business subcontracting plan that contains all of the required elements. which of the following is true? a.the contractor must submit a standard form 294, subcontracting report for individual contracts. b.the contractor must submit an individual subcontracting report through the electronic subcontracting reporting system (esrs). c.the contractor may submit either an sf 294 or report its subcontracting through esrs. d.the contractor is not required to submit any subcontracting reports.
Answers: 1
question
Business, 23.06.2019 11:00
Stacy is preparing a product presentation with customer, marketing, and technical content. she will first present it to an engineering audience mainly interested in technical product details. what should she do? select the best option. hide the marketing content slides for the engineering audience. save a new version and delete unwanted slides for this audience. cut and paste all the unwanted slides to the end. create a custom slide show for multiple audiences.
Answers: 3
You know the right answer?
Which of the following costs would a computer manufacturer include in manufacturing overhead? a. The...
Questions
question
Mathematics, 28.06.2019 17:30
question
Spanish, 28.06.2019 17:30