subject
Business, 06.11.2019 06:31 21ghostrider21

On a separate sheet of paper, copy the multi- flow map below. organize information on how firms determine their total costs by completing the multi flow map with examples of fixed and variable costs.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 03:40
Electronics assembly inc. is a contract manufacturer that assembles consumer electronics for a number of companies. currently, the operations manager is assessing the capacity requirements as input into a bid for a job to assemble cell phones for a major global company. the company would assemble three models of cell phones in the same assembly cell. setup time between the phones is negligible. electronics assembly inc. operates two 8-hour shifts for 275 days per year. cell phone demand forecast (phones/year) processing time (minutes/phone) mars 47,000 19.8 saturn 35,000 20.7 neptune 7,500 16.2 a. calculate total capacity required by line. b. determine the total operating time available. c. calculate the total number of assembly cells. (round up your answer to the next whole number.)
Answers: 2
question
Business, 22.06.2019 07:40
Shelby company produces three products: product x, product y, and product z. data concerning the three products follow (per unit): product x product y product z selling price $ 85 $ 65 $ 75 variable expenses: direct materials 25.50 19.50 5.25 labor and overhead 25.50 29.25 47.25 total variable expenses 51.00 48.75 52.50 contribution margin $ 34.00 $ 16.25 $ 22.50 contribution margin ratio 40 % 25 % 30 % demand for the company’s products is very strong, with far more orders each month than the company can produce with the available raw materials. the same material is used in each product. the material costs $8 per pound, with a maximum of 4,400 pounds available each month. required: a. compute contribution margin per pound of materials used. (round your intermediate calculations and final answers to 2 decimal places.) contribution margin per pound product x $ product y $ product z $ b. which orders would you advise the company to accept first, those for product x, for product y, or for product z? which orders second? third? product x product y product z
Answers: 3
question
Business, 22.06.2019 11:30
17.     chef a says that garnish should be added to a soup right before serving. chef b says that garnish should be cooked with the other ingredients in a soup. which chef is correct? a. chef a is correct. b. both chefs are correct. c. chef b is correct. d. neither chef is correct. student c   incorrect which is correct answer?
Answers: 2
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
You know the right answer?
On a separate sheet of paper, copy the multi- flow map below. organize information on how firms dete...
Questions
question
Mathematics, 29.01.2021 18:00
question
Mathematics, 29.01.2021 18:00
question
English, 29.01.2021 18:00
question
Mathematics, 29.01.2021 18:00
question
Mathematics, 29.01.2021 18:00
question
Physics, 29.01.2021 18:00
question
Mathematics, 29.01.2021 18:00
question
Mathematics, 29.01.2021 18:00
question
Mathematics, 29.01.2021 18:00
question
English, 29.01.2021 18:00