subject
Physics, 31.07.2019 15:30 wilkinsserrano3

Aconcrete bridge is built of 315-cm-long concrete slabs with an expansion joint between them. the slabs just touch on a 115∘f day, the hottest day for which the bridge is designed.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 04:00
Amodel rocket with a mass of 0.212 kg is launched into the air with an initial speed of 84 m/s. how much kinetic energy will the rocket have at a height of 214 m? assume there is no wind resistance. 634 j 303 j
Answers: 2
question
Physics, 22.06.2019 08:30
Brutus, the dog, is pulling a bone to the left with a force of 20 n. lassie, another dog, is pulling a bone to the right with a force of 18n. what is the net force? a. b. c.
Answers: 1
question
Physics, 22.06.2019 17:40
A15.75-g piece of iron absorbs 1086.75 joules of heat energy, and its temperature changes from 25°c to 175°c. what is the specific heat capacity of iron?
Answers: 1
question
Physics, 22.06.2019 22:00
A51 kg woman skis down a hill and her kinetic energy is 9.96e4 j. what is her speed?
Answers: 2
You know the right answer?
Aconcrete bridge is built of 315-cm-long concrete slabs with an expansion joint between them. the sl...
Questions
question
Mathematics, 19.11.2020 19:00
question
Mathematics, 19.11.2020 19:00
question
World Languages, 19.11.2020 19:00