subject
Physics, 22.07.2019 16:50 allytrujillo20oy0dib

Calculate the work done on a 1500-kg elevator car by its cable to lift it 40.0 m at constant speed, assuming friction averages 100 n. (b) what is the work done on the lift by the gravitational force in this process? (c) what is the total work done on the lift?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 16:30
Daltonā€™s model of an atom is the best described as a) a solar system b) a solid sphere c) a cloud d) a scoop of chocolate chip ice cream
Answers: 1
question
Physics, 21.06.2019 22:00
Atank holds 1000 gallons of water, which drains from the bottom of the tank in half an hour. the values in the table show the volume v of water remaining in the tank (in gallons) after t minutes.t(min) 5 10 15 20 25 30v(gal) 694 444 250 111 28 0(a) if p is the point (15, 250) on the graph of v, find the slopes of the secant lines pq when q is the point on the graph with t = 5, 10, 20, 25, and 30.(b) estimate the slope of the tangent line at p by averaging the slopes of two secant lines.(c) use a graph of the function to estimate the slope of the tangent line at p. (this slope represents the rate at which the water is flowing from the tank after 15 minutes.)show all steps.
Answers: 2
question
Physics, 22.06.2019 12:00
This is for my 8th grade science class, i really donā€™t understand. can someone me? , lol.
Answers: 1
question
Physics, 22.06.2019 16:30
Write a polynomial function with the given zeros x= -1,0,2show your work
Answers: 3
You know the right answer?
Calculate the work done on a 1500-kg elevator car by its cable to lift it 40.0 m at constant speed,...
Questions
question
Mathematics, 22.05.2020 00:03
question
Mathematics, 22.05.2020 00:03