subject
Physics, 09.12.2021 19:30 brayann5761

Read the excerpt from The Building of Manhattan. A temporary, small narrow-gauge track system was installed on each floor as it was needed. This enabled the material to be moved from the truck at ground level onto dump carts, raised by elevator to the designated floor, wheeled onto the track, and moved quickly to the exact spot needed. Turntables built into the track allowed the carts to be shifted about in any direction.

Which question can be answered only if an illustration accompanies the text?

What did turntables built into the track allow?
How were dump carts raised to designated floors?
When was a track system installed on a floor?
What does a turntable built into a track loo

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 17:00
Why is there friction between objects
Answers: 1
question
Physics, 22.06.2019 15:30
Match each scenario to the form of energy it represents
Answers: 2
question
Physics, 23.06.2019 05:20
Derive the formula 2as=v² -u² where the formula have have usual meanings
Answers: 1
question
Physics, 23.06.2019 05:30
If a rock weighing 54 n is submerged in a liquid with a density exactly twice that of water, what will be its new apparent weight reading in the liquid?
Answers: 3
You know the right answer?
Read the excerpt from The Building of Manhattan. A temporary, small narrow-gauge track system was...
Questions
question
Mathematics, 16.10.2020 05:01
question
Biology, 16.10.2020 05:01
question
Mathematics, 16.10.2020 05:01
question
World Languages, 16.10.2020 05:01