subject
Physics, 10.10.2021 14:00 shacarabrown49

A cart loaded with bricks has a total mass of 12.7 kg and is pulled at constant speed by
a rope. The rope is inclined at 22.5◦
above the horizontal and the cart moves 30.7 m on
a horizontal floor. The coefficient of kinetic
friction between ground and cart is 0.7
The acceleration of gravity is 9.8 m/s
2-How much work is done on the cart by the
rope?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 12:10
Aspring has a natural length of 8 m. if a 12-n force is required to keep it stretched to a length of 10 m, how much work w is required to stretch it from 8 m to 16 m? (round your answer to two decimal places.)
Answers: 1
question
Physics, 22.06.2019 13:00
Discuss how the hardness or softness of the landing surface is related to the time required to stop the egg
Answers: 1
question
Physics, 22.06.2019 22:00
Which of these is the best way to manage a natural resource
Answers: 3
question
Physics, 22.06.2019 22:20
The starship enterprise is caught in a time warp and spock is forced to use the primitive techniques of the 20th century to determine the specific heat capacity of an unknown mineral. the 125-g sample was heated to 96.3°c and placed into a calorimeter containing 85.9 g of water at 20.0°c. the heat capacity of the calorimeter was 14.2 j/k. the final temperature in the calorimeter was 24.5°c. what is the specific heat capacity (in j/g°c) of the mineral? enter to 4 decimal places.
Answers: 1
You know the right answer?
A cart loaded with bricks has a total mass of 12.7 kg and is pulled at constant speed by
a r...
Questions
question
Mathematics, 20.05.2021 20:10
question
Mathematics, 20.05.2021 20:10
question
Computers and Technology, 20.05.2021 20:10