subject
Physics, 19.03.2021 21:00 perezsamantha3oqr0za

A student pulls an object (126kg) along a rough flat surface by a massless string. The tension force exerted by the string on the object is 148.0N, as the pot is pulled forward 15.0m at a constant velocity of (0.5 m/s)i. 1. Calculate work done by tension force on object over this distance
2. If student speeds up increasing the tension force in the string over a distance of x=0 to 6.0m. Find work done by tension force

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 07:30
Gas cloud 1 is likely to form a star. gas cloud 2 is not. based on this information, match the given conditions with each cloud
Answers: 2
question
Physics, 22.06.2019 08:00
Tafari worked one summer on a ship that set weather buoys in the ocean. he watched how one of the buoys moved in the water. describe which parts of the wave would cause the buoy to bob up and down. which wave property determined how fast the buoys bobbed in the water? he observed that when the wind blew harder, the ocean waves were larger, and the buoys moved away from the ship. what effect, if any, did the waves have on how far the buoys moved? explain your answer.
Answers: 3
question
Physics, 22.06.2019 09:40
Aturntable a is built into a stage for use in a theatrical production. it is observed during a rehearsal that a trunk b starts to slide on the turntable 10 s after the turntable begins to rotate. knowing that the trunk undergoes a constant tangential acceleration of 0.31 m/s2, determine the coefficient of static friction between the trunk and the turntable.
Answers: 3
question
Physics, 22.06.2019 12:30
What is the equation for electrical work?
Answers: 3
You know the right answer?
A student pulls an object (126kg) along a rough flat surface by a massless string. The tension force...
Questions
question
Mathematics, 17.05.2021 01:00