subject
Physics, 02.03.2021 06:20 NycLife

A 2,000 kg rocket is launched 12 km straight up at a constant acceleration into the sky at which point the rocket is travelling at 750 m/s. a) How much work was done by the rocket? b) What is the magnitude of the acceleration of the rocket? c) How long did the flight take?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 23:00
Atrain departs from its station at a constant acceleration of 5 m/s. what is the speed of the train at the end of 20s?
Answers: 1
question
Physics, 22.06.2019 05:20
Suppose an objects initial velocity is 10m/s and it’s final velocity is 4 m/s. mass is constant. what can best be concluded about the object based in the work-energy theorem
Answers: 2
question
Physics, 22.06.2019 11:30
If the chemical properties of a substance remain unchanged and appearance or shape of a substance changes it is called a ?
Answers: 1
question
Physics, 22.06.2019 12:00
The mass of a bowling ball is 10 kg and the mass of a ping pong ball is 0.015 kg. if the two objects are 5 meters apart, what is the gravitational force ?
Answers: 1
You know the right answer?
A 2,000 kg rocket is launched 12 km straight up at a constant acceleration into the sky at which poi...
Questions
question
Mathematics, 02.04.2020 02:57
question
Chemistry, 02.04.2020 02:58