subject
Physics, 16.02.2021 19:30 kornut7316

A worker pushes horizontally on a large crate with a force of 245 N, and the crate is moved 3.2 m. How much work was done?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 05:40
The difference between a red shift and a blue shift has to do with wavelength frequency. t or f
Answers: 1
question
Physics, 22.06.2019 20:30
Atypical jetliner lands at a speed of 146 mi/h and decelerates at the rate of (10.4 mi/h)/s. if the jetliner travels at a constant speed of 146 mi/h for 1.5 s after landing before applying the brakes, what is the total displacement of the jetliner between touchdown on the runway and coming to rest?
Answers: 2
question
Physics, 22.06.2019 23:00
According to the image below, which season is about to begin in the southern hemisphere? a. summer b. autumn c. winter d. spring
Answers: 1
question
Physics, 22.06.2019 23:20
Consider a production line with five stations. station 1 can produce a unit in 9 minutes. station 2 can produce a unit in 10 minutes. station 3 has two identical machines, each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines. station 4 can produce a unit in 5 minutes. station 5 can produce a unit in 8 minutes. which station is the bottleneck station?
Answers: 2
You know the right answer?
A worker pushes horizontally on a large crate with a force of 245 N, and the crate is moved 3.2 m. H...
Questions