subject
Physics, 13.02.2021 14:00 bri9263

6. Jason accidentally spilled coffee on Cee Lo's solution to his inductive reasoning assignment. One of the conjectures in the solutions was mostly legible and is shown.

“The sum of three consecutive integers is always three times the...”

Determine the missing portion using inductive reasoning.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 19:00
Fill in the blank. the number of each type of element in the compound (other than 1) is represented by a small number to the right of the element symbol.
Answers: 1
question
Physics, 22.06.2019 00:00
Astate of matter all that has define volume and can flow is a(n)
Answers: 3
question
Physics, 22.06.2019 05:20
Very large accelerations can injure the body, especially if they last for a considerable length of time. one model used to gauge the likelihood of injury is the severity index ( ), defined as =/ . in the expression, is the duration of the accleration, but is not equal to the acceleration. rather, is a dimensionless constant that = the number of multiples of that the acceleration is equal to.in one set of studies of rear-end collisions, a person's velocity increases by 13.7 km/h with an acceleration of 36.0 m/s2 . let the + direction point in the direction the car is traveling. what is the severity index for the collision?
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
6. Jason accidentally spilled coffee on Cee Lo's solution to his inductive reasoning assignment. On...
Questions
question
Engineering, 11.01.2020 00:31
question
Social Studies, 11.01.2020 00:31