12. A solar-thermal power plant (Tonapah, for example) might cost $2B to build and operate over its 20 year lifetime. Assume it generates 100 MW for 8 hours a day; assume it is always sunny during the days:
a) How much must be charged wholesale for generation of this electricity, just to cover that initial cost?
Please compute the cost in $/kW-hr, which is the wholesale consumer cost that is quoted. Note for a
natural gas power plant, this wholesale cost is $0.05/kW-hr, approximately. Make any simplifying econ.
assumptions postulates as are helpful.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 16:20
Describe how the fermi level changes with donor level, temperature and contact with p and n type semiconductors
Answers: 1
question
Physics, 22.06.2019 01:30
John throws .4 kg ball with velocity of 18 m/s. hits .2 kg bottle and bottle flies 25 m/s. how fast is ball traveling after hitting the bottle?
Answers: 1
question
Physics, 22.06.2019 05:30
What tightening torque should be used for a hexagonal head screw (not split-bolt) on a 250 kcmil conductor?
Answers: 3
question
Physics, 22.06.2019 14:30
Alandscaper is shopping for landscaping materials. she wants to use materials through which water flows easily. which materials should she choose? check all that apply. clay gravel granite rocks with cracks loosely packed soil
Answers: 2
You know the right answer?
12. A solar-thermal power plant (Tonapah, for example) might cost $2B to build and operate over its...
Questions
question
Mathematics, 30.01.2021 01:50
question
Mathematics, 30.01.2021 01:50
question
Mathematics, 30.01.2021 01:50
question
Mathematics, 30.01.2021 01:50