subject
Physics, 30.12.2020 18:30 mat1413

In May 1990 the French TGV train traveled the distance from Paris to Lille, France (127 miles) in 0.819 hours. What was the speed of the TGV in m/s

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 06:30
If an atom contains 11 protons in its nucleus, predict the element with the atomic number and electronic configuration. will the number of electrons remain the same during the chemical reaction in such an atom? explain.
Answers: 3
question
Physics, 22.06.2019 06:30
What is the energy of a photon of ultraviolet radiation with a frequency of 4.4 Γ— 1015 hz? planck’s constant is 6.63 Γ— 10–34
Answers: 3
question
Physics, 22.06.2019 07:30
Automobile fuel efficiency is often measured in miles that the car can be driven per gallon of fuel (mpg). heavier cars tend to have lower fuel efficiencies (lower mpg ratings). which variable (weight or fuel efficiency) is most naturally considered the explanatory (predictor) variable in this context?
Answers: 3
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
In May 1990 the French TGV train traveled the distance from Paris to Lille, France (127 miles) in 0....
Questions
question
Mathematics, 02.11.2020 19:00
question
Mathematics, 02.11.2020 19:00
question
Mathematics, 02.11.2020 19:00
question
Chemistry, 02.11.2020 19:00
question
Mathematics, 02.11.2020 19:00
question
Geography, 02.11.2020 19:00
question
English, 02.11.2020 19:00
question
English, 02.11.2020 19:00