subject
Physics, 27.11.2020 22:40 NONO3456

A crate is lifted vertically 1.5 m and then held at rest. The crate has weight 100 N (i. e., it is supported by an upward force of 100 N). How much work was done in lifting the crate from the ground to its final position? 1. 150 J 2. More than 150 J 3. None of these 4. A bit less than 150 J 5. No work was doneNow suppose the crate is lifted so rapidly that air resistance was significant during the raising. How much work was done by the lifting force as the box was raised 1.5 m?1. None of these 2. No work was done. 3. More than 150 J 4. Still 150 J 5. A bit less than 150 J because the air partially supported the crate.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 23:20
Initially, a particle is moving at 5.33 m/s at an angle of 37.9° above the horizontal. two seconds later, its velocity is 6.11 m/s at an angle of 54.2° below the horizontal. what was the particle's average acceleration during these 2.00 seconds in the x-direction (enter first) and the y-direction?
Answers: 1
question
Physics, 21.06.2019 23:30
A175 g lump of molten lead at its melting point (327 c) is placed into 55.0 g of water at 20.0 c. the specific heat of lead is 130.j/kg c and the hf of lead is 20,400 j/kg. when the lead and the water have reached equilibrium, what is the temperature of the mixture?
Answers: 3
question
Physics, 22.06.2019 10:30
In science and physics what is the standard unit of measure for speed?
Answers: 1
question
Physics, 22.06.2019 13:40
Dao makes a table to identify the variables used in the equations for centripetal acceleration. what quantities belong in cells x and y?
Answers: 2
You know the right answer?
A crate is lifted vertically 1.5 m and then held at rest. The crate has weight 100 N (i. e., it is s...
Questions
question
Mathematics, 12.02.2021 06:30
question
Mathematics, 12.02.2021 06:30