subject
Physics, 02.11.2020 14:00 abbz13

It takes 25 J of work to pull a 5.0 N object 4.0 m along the floor at constant speed. How much work is done to overcome friction? a. 25 J b. 20 J c. 5.0 J d. 1.3 J

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 15:10
Alightning strike consists of charge moving from a cloud to the ground . in one particular case, the electrons in a lightning strike are confined to travel within a radius of 1.5 m and to move at a speed of 5.0 x 10 m/s. if the density of electrons in the strike is 10'15 electrons/m what current is carried by the lightning ?
Answers: 1
question
Physics, 21.06.2019 19:30
Molten iron fills a mould, which has a volume of 200 cm cubed. calculate the volume when the iron cools and solidifies. molten iron has a density of 7.0g/cm cubed. in its solid state, iron has a density of 8.0g/cm cubed.
Answers: 3
question
Physics, 22.06.2019 02:30
Which of the following are properties of mechanical waves? check all that apply ⭕️ particles of the medium move back and fourth, but do not move with the wave. ⭕️ the particles of the medium always move parallel to the wave motion. ⭕️ wave motion begins with a disturbance in the medium. ⭕️ waves transport energy from a source outward, away from the source.
Answers: 2
question
Physics, 22.06.2019 12:00
Infrared radiation has wavelengths that are shorter than visible light is part of the visible light spectrum has wavelengths that are longer than visible light has the same wavelengths as ultraviolet radiation
Answers: 1
You know the right answer?
It takes 25 J of work to pull a 5.0 N object 4.0 m along the floor at constant speed. How much work...
Questions
question
Business, 11.07.2019 00:30