A project consists of replacing the track on an existing railroad line, involving 3,000 feet of track. The old track can be removed at a rate of 70 feet per hour. The old railroad ties can be removed at a rate of 200 feet (measured along the track) per hour. The new ties can be installed at a rate of 25 feet per hour, and the replacement track can be installed at a rate of 40 feet per hour. Show this operation on a linear schedule. Assume that the minimum float (buffer) for an activity at any location is 1 day.

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 12:00
The mass of a bowling ball is 10 kg and the mass of a ping pong ball is 0.015 kg. if the two objects are 5 meters apart, what is the gravitational force ?
Answers: 1
question
Physics, 22.06.2019 13:40
An ideal otto cycle has a compression ratio of 10.5, takes in air at 90 kpa and 40°c, and is repeated 2500 times per minute. using constant specific heats at room temperature, determine the thermal efficiency of this cycle and the rate of heat input if the cycle is to produce 90 kw of power.
Answers: 2
question
Physics, 22.06.2019 19:30
The nuclear potential that binds protons and neutrons in the nucleus of an atom is often approximated by a square well. imagine a proton conned in an innite square well of length 105 nm, a typical nuclear diameter. calculate the wavelength and energy associated with the photon that is emitted when the proton undergoes a transition from the rst excited state (n 2) to the ground state (n 1). in what region of the electromagnetic spectrum does this wavelength belong?
Answers: 1
question
Physics, 23.06.2019 00:30
Name three populations commonly found in a prairie system
Answers: 1
You know the right answer?
A project consists of replacing the track on an existing railroad line, involving 3,000 feet of trac...
Questions
question
Mathematics, 18.08.2021 03:00
question
Mathematics, 18.08.2021 03:00
question
Social Studies, 18.08.2021 03:00