subject
Physics, 08.10.2020 18:01 badboy502503

You are an engineer in charge of designing a new generation of elevators for a prospective upgrade to the Empire State Building. Before the state legislature votes on funding for the project, they would like you to prepare a report on the benefits of upgrading the elevators. One of the numbers that they have requested is the time it will take the elevator to go from the ground floor to the 102nd floor observatory. They are unlikely to approve the project unless the new elevators make the trip much faster than the old elevators. If state law mandates that elevators cannot accelerate more than 2.10 m/s2 or travel faster than 10.3 m/s , what is the minimum time in which an elevator can travel the 373 m from the ground floor to the observatory floor

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 23:20
In the sport of parasailing, a person is attached to a rope being pulled by a boat while hanging from a parachute-like sail. a rider is towed at a constant speed by a rope that is at an angle of 15 ∘ from horizontal. the tension in the rope is 1900 n. the force of the sail on the rider is 30∘ from horizontal. what is the weight of the rider? express your answer with the appropriate units.
Answers: 1
question
Physics, 21.06.2019 23:30
What are chlorofluorocarbons and what impact do they have on the atmosphere?
Answers: 1
question
Physics, 22.06.2019 03:00
The respiratory system removes oxygen and water from the body. select the best answer from the choices provided t f
Answers: 2
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
You are an engineer in charge of designing a new generation of elevators for a prospective upgrade t...
Questions