subject
Physics, 26.06.2020 16:01 Aprilbtrippin2004

The only force acting on a 3.2 kg canister that is moving in an xy plane has a magnitude of 6.7 N. The canister initially has a velocity of 3.3 m/s in the positive x direction, and some time later has a velocity of 6.9 m/s in the positive y direction. How much work is done on the canister by the 6.7 N force during this time

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 19:30
What is hidden during a lunar eclipse? isn't the moon hidden?
Answers: 2
question
Physics, 22.06.2019 03:10
Aphysical change is a change in the size, shape,, or stafe of matter true or false
Answers: 1
question
Physics, 22.06.2019 05:10
Which situation will have the highest resistance? a.long wire and high temperatureb.short wire and high temperaturec.long wire and cold temperaturedshort wire and low temperature
Answers: 2
question
Physics, 22.06.2019 11:00
A0.580-kg rock is tied to the end of a string and is swung in a circle with a radius of 0.500 meters. the velocity of the rock is 4.50 m/s. what is the centripetal force acting on the rock? 15.5 n 5.22 n 69.8 n 23.5 n
Answers: 3
You know the right answer?
The only force acting on a 3.2 kg canister that is moving in an xy plane has a magnitude of 6.7 N. T...
Questions
question
Chemistry, 24.02.2021 21:40
question
Arts, 24.02.2021 21:40
question
Mathematics, 24.02.2021 21:40
question
Mathematics, 24.02.2021 21:50
question
Geography, 24.02.2021 21:50