subject
Physics, 17.04.2020 03:34 thelordoftheknowwjo4

The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown (DT) and southwest (SW) of the metropolitan area. The city already owns enough land at the DT site; however, the land for a parking garage will cost $1 million, and construction costs will be $12 million for the parking garage, infrastructure relocation, and drainage. The SW site is 30 km from downtown, but the land will be donated by a developer who knows that an arena at this site will dramatically increase the value of the remainder of his land holdings. Because of its centralized location, there will be greater attendance at most of the events held at the DT site. This will result in more revenue to vendors and local merchants in the amount of $750,000 per year. Additionally, the average attendee will not have to travel as far, resulting in annual benefits of $400,000 per year. All other costs and revenues are expected to be the same at either site. If the city uses a discount rate of 11% per year, and will construct at one site or the other, which site should be selected

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 00:00
Name three different units of energy used to measure heat and describe what type of situations each is usually used.
Answers: 1
question
Physics, 23.06.2019 04:20
The velocity of sound wave in air at 35°c is 353m/s, calculate the velocity of sound at 46°c
Answers: 1
question
Physics, 23.06.2019 05:00
Awaiver with a period of 0.008 second has a frequency of a. 800hz. b. 80hz. c. 125hz. d. 12.5hz.
Answers: 1
question
Physics, 23.06.2019 07:00
What effect does the sun have on the earth. written response
Answers: 1
You know the right answer?
The city engineer and economic development directors are evaluating two sites for construction of a...
Questions
question
English, 17.09.2021 15:30
question
English, 17.09.2021 15:30