subject
Physics, 04.04.2020 02:30 zaymuney3063

The highest occupiable floor of any building is in the Sears Tower in Chicago. The elevators of the central tower of the building lift passengers 436.0 m above street level. If a continuous forces of 22310 N is exerted on one of these elevator cars as it travels from the ground to the top floor, how much work is done on the elevator car by the elevator's lifting mechanism?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 02:30
Awave travels at a speed of 5.2 m/s. if the distance between crests is 0.40 m, what is the frequency of the wave? use f=v/wavelength a. 13 hz b. 2.1 hz c. 0.077 hz d. 5.6 hz
Answers: 1
question
Physics, 22.06.2019 07:10
Road users moving into your lane, brake lights, and abrupt changes in road surface are a. rare at night b. indicators of potential hazards c. not worth worrying about before you reach them d. no problem for experienced drivers
Answers: 1
question
Physics, 22.06.2019 20:30
Four identical lab carts each have a mass of 200 kg. different masses are added to the carts and the velocities are measured. all carts move to the right.
Answers: 3
question
Physics, 22.06.2019 20:50
An ideal otto cycle has a compression ratio of 8. at the beginning of the compression process, air is at 95 kpa and 27°c, and 750 kj/kg of heat is transferred to air during the constant-volume heat-addition process. assuming constant specific heats at room temperature, determine (a) the pressure and temperature at the end of the heat-addition process, (b) the net work output, (c) the thermal efficiency, and (d) the mean effective pressure for the cycle. (4390 kpa, 1730 k; 423 kj/kg; 56.4%; 534 kpa)
Answers: 1
You know the right answer?
The highest occupiable floor of any building is in the Sears Tower in Chicago. The elevators of the...
Questions
question
Mathematics, 14.02.2020 06:17
question
Mathematics, 14.02.2020 06:18
question
Mathematics, 14.02.2020 06:18