subject
Physics, 24.03.2020 22:54 taekookie01

In an elastic collision, a 475 kg bumper car collides directly from behind with a second bumper car that is traveling in the same direction. The mass of the leading bumper car is 30.0% greater than that of the trailing bumper car. The initial speed of the leading bumper car is 3.70 m/s, and that of the trailing car is 7.50 m/s. Assuming that the mass of the drivers is much, much less than that of the bumper cars, what are their final speeds? (Enter your answers in m/s. Due to the nature of this problem, do not use rounded intermediate values in your calculations—including answers submitted in WebAssign.)

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 08:40
Apulley system is used to lift a 2,000 newton engine up a distance of 3 meters. the operator must apply a force of 250 newtons to the chain of the pulley system to lift the motor. to lift the engine 3 meters, the operator must pull a total of 30 meters of chain through the pulley system. what is the value of di?
Answers: 1
question
Physics, 22.06.2019 11:40
Consider the following position function. find (a) the velocity and the speed of the object and (b) the acceleration of the object. bold r left parenthesis t right parenthesisr(t)equals=left angle 6 t superscript 4 baseline comma 2 t cubed right angle6t4,2t3 for tgreater than or equals≥0
Answers: 3
question
Physics, 22.06.2019 16:00
Agroup of monkeys is trying to cross the river in a rowboat. the maximum buoyant force on the rowboat is 2,000 n. the weight of the rowboat is 1,000 n. each monkey has a weight of 150 n. how many monkeys can safely cross in the rowboat at one time? explain your reasoning, including any calculations you used to find the answer.
Answers: 1
question
Physics, 22.06.2019 20:50
The second largest public utility in the nation is the sole provider of electricity in 32 counties of southern florida. to meet the monthly demand for electricity in these counties, which is given by the inverse demand function p = 1,200 – 4q, the utility company has set up two electric generating facilities: q1 kilowatts are produced at facility 1, and q2 kilowatts are produced at facility 2 (so q = q1 + q2). the costs of producing electricity at each facility are given by c1(q1) = 8,000 + 6q12 and c2(q2) = 6,000 + 3q22, respectively. determine the profit-maximizing amounts of electricity to produce at the two facilities, the optimal price, and the utility company’s profit
Answers: 3
You know the right answer?
In an elastic collision, a 475 kg bumper car collides directly from behind with a second bumper car...
Questions
question
Mathematics, 23.02.2021 16:20
question
Mathematics, 23.02.2021 16:20
question
History, 23.02.2021 16:20
question
Mathematics, 23.02.2021 16:20