subject
Physics, 28.02.2020 04:02 tori6886

A construction company employs two sales engineers. Engineer 1 does the work of estimating cost for 70% of jobs bid by the company. Engineer 2 doe the work for 30% of jobs bid by the company. It is known that the error rate for engineer 1 is 0.02 when he does the work, whereas the error rate is 0.04 for engineer 2. Suppose a bid arrives and a serious error occurs in estimating cost. Which engineer would you guess did the work?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 05:10
Total solidification times of three casting geometries are to be compared: a sphere, a cylinder, in which the length-to-diameter ration - 1.0, and a cube. volume = 1000 cm^3 for all three shhapes, and the same casting alloy is used. a) determine the solidification times of each geometry b) based on the results of part (a), which geometric element would make the best riser? c) if the mold constant = 3.5 min/cm^2 in chvorinov's rule, compute the total solidification time for each casting.
Answers: 3
question
Physics, 22.06.2019 16:40
The astronauts on the space shuttle flights experienced an acceleration of 29 m/s2 (about 3 "g's") during lift-off. what upward force must the astronaut's seat apply to the astronaut in order to cause this acceleration? assume the astronaut's mass is 70 kg, and compute this force when the acceleration is near the earth's surface so their weight equals latex: mg m g .
Answers: 3
question
Physics, 23.06.2019 13:00
What event happens once every month
Answers: 1
question
Physics, 23.06.2019 14:00
Which of the following is an example of a compound machine. a. a bicycle chain. b. a coffee mug. c. a paper cutter
Answers: 1
You know the right answer?
A construction company employs two sales engineers. Engineer 1 does the work of estimating cost for...
Questions
question
Mathematics, 09.03.2021 23:40
question
Mathematics, 09.03.2021 23:40
question
Biology, 09.03.2021 23:40
question
History, 09.03.2021 23:40
question
English, 09.03.2021 23:40