A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 17:10
The “death throes” of stars are amongst the most complex phenomena in all of astronomy, and the “corpses” of stars amongst the most energetic and exotic objects in existence. beginning at the end of the core helium fusion stage in a star’s life, describe in detail the post-main sequence development of both (a) a 1.0 solar mass star, and (b) a 25.0 solar mass star. in what significant ways do they differ? what role does each of these types of stars play in the "star-gas-star" cycle and the evolution of chemical elements in our galaxy?
Answers: 1
question
Physics, 22.06.2019 05:30
Thomas his older brothers, who own a junk yard, on the weekends to earn extra money. he likes to them push broken-down cars to the back of the junk yard because it makes him feel strong. last saturday, they pushed three cars with different weights, and he noticed he used different amounts of force for each one. the cars were the following weights: white car: 2,700 kg red car: 1,500 kg blue car: 2,100 kg think about how much force is needed to move each car. which correctly lists the cars in order from the most to least amount of force needed to move them? a) white, blue, red b) blue, red, white c) red, white, blue d) white, red, blue
Answers: 2
question
Physics, 22.06.2019 07:00
The table below shows the acceleration of gravity on different bodies in the solar system. on which body would a 10 kg lamp has the most gravitational potential energy when lifted to a height of 2 m? a. earth b. mars c. neptune d. uranus
Answers: 1
question
Physics, 22.06.2019 20:00
Anika asks eva to roll a basketball and then a bowling ball to her. which requires more force to roll, and why?
Answers: 3
You know the right answer?
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to as...
Questions
question
Mathematics, 16.12.2019 12:31
question
Mathematics, 16.12.2019 12:31
question
Mathematics, 16.12.2019 12:31
question
Mathematics, 16.12.2019 12:31