subject
Physics, 22.02.2020 01:00 taniyahbenyamin2

Question 1. (2 points) Complete the scraper-pusher load time optimization spreadsheet discussed in the lecture. Use the following data to populate your Excel spreadsheet. A project has only one CAT 631 E scraper available, but many pushers can be assigned to the project. The project has the following conditions: ï‚· Haul distance = 800 meter ï‚· Return distance = 900 meter ï‚· Average haul speed = 22 km/hr ï‚· Average return speed = 36 km/hr ï‚· Dump time = 1.2 min What is the optimum scraper-pusher loading time for this project? Please also submit your completed Excel spreadsheet.

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 18:30
What is the conversion factor between kg/m^3 and g/m^3. express your experimental values for the densities in kg/m^3.
Answers: 1
question
Physics, 22.06.2019 10:00
A2k pendulum has a speed of 1 m/s at a height of 1/2 meter
Answers: 3
question
Physics, 22.06.2019 12:30
What is the power rating of the lightbulb if 3.0 a flow through it when connected to a 15 v battery
Answers: 1
question
Physics, 22.06.2019 14:30
In order to do work, the force vector must be question 1 options: in a different direction than the acceleration vector. in a different direction than the displacement vector. in the same direction as the displacement vector and the motion. in the same direction as the acceleration vector.
Answers: 1
You know the right answer?
Question 1. (2 points) Complete the scraper-pusher load time optimization spreadsheet discussed in t...
Questions
question
English, 27.11.2019 07:31
question
Mathematics, 27.11.2019 07:31
question
Mathematics, 27.11.2019 07:31
question
Mathematics, 27.11.2019 07:31