subject
Physics, 24.12.2019 00:31 cass9980

Assume that a product goes through three sequential processes a, b, and c. moreover, assume that each process takes 3 minutes per unit. currently, there is an order for 5 units of this product to be produced. if the manufacturer employs a one-piece flow system, what is the earliest time for completing the first unit of this product? select one: a. 9 minutes b. 45 minutes c. 15 minutes d. 36 minutes e. 6 minutes

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 21:10
Tafari worked one summer on a ship that set weather buoys in the ocean. he watched how one of the buoys moved in the water. describe which parts of the wave would cause the buoy to bob up and down. which wave property determined how fast the buoys bobbed in the water? he observed that when the wind blew harder, the ocean waves were larger, and the buoys moved away from the ship. what effect, if any, did the waves have on how far the buoys moved? explain your answer.
Answers: 3
question
Physics, 22.06.2019 01:00
An incident ray through the focal point of a spherical mirror will: reflect through the center of curvature. reflect back through the focal point. reflect parallel to the principle axis. reflect the same direction as the incident ray.
Answers: 1
question
Physics, 22.06.2019 01:20
An engineer designs a roller coaster so that a car travels horizontally for 152 ft, then climbs 137 ft at an angle of 34.0° above the horizontal. it then moves 137 ft at an angle of 48.0° below the horizontal. if we take the initial horizontal motion of the car to be along the +x-axis, what is the car's displacement? (give the magnitude of your answer, in ft, to at least four significant figures and give the direction of your answer in degrees counterclockwise from the +x-axis.)
Answers: 1
question
Physics, 22.06.2019 04:30
The image shows the positions of a car on a roller coaster track. arrange the cars in order based on their gravitational potential energy. begin with the lowest potential energy and end with the highest.
Answers: 1
You know the right answer?
Assume that a product goes through three sequential processes a, b, and c. moreover, assume that eac...
Questions
question
Mathematics, 11.05.2021 18:10
question
Mathematics, 11.05.2021 18:10