subject
Physics, 27.11.2019 04:31 Mrabas

)(si units) a shielded metal arc-welding operation is performed on low-carbon steel plates at a voltage = 25 volts and current = 150 amps. the heat transfer factor = 0.90, and the melting factor = 0.75. the melting temperature of low-carbon steel = 1487°c, and the unit melting energy can be determined by the methods of the previous chapter. using si units, determine the (a) rate of heat generation at the weld and (b) volume rate of metal welded.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 05:00
At time t=0, a particle is located at the point (3,6,9). it travels in a straight line to the point (5,2,7), has speed 8 at (3,6,9) and constant acceleration 2i−4j−2k. find an equation for the position vector of the particle.
Answers: 2
question
Physics, 22.06.2019 19:30
What characteristics of hv2112 make it the best candidate to be classified as a thorne-zytkow object?
Answers: 3
question
Physics, 23.06.2019 02:30
Acircular ring of charge with radius b has total charge q uniformly distributed around it. what is the magnitude of the electric field at the center of the ring? 0 keq/b2 keq2/b2 keq2/b none of these answers
Answers: 3
question
Physics, 23.06.2019 03:30
Which statement is true? a) the work done to lift an object 6 meters is greater than the gravitational potential energy it gains. b) the work required to push an object is less than the work required to pull an object the same distance. c) the work required to raise an object to a height is equal to the gravitational potential energy the object gains. d) the work done against gravity to lift an object straight up is greater than the work required to roll it up a ramp.
Answers: 1
You know the right answer?
)(si units) a shielded metal arc-welding operation is performed on low-carbon steel plates at a volt...
Questions
question
Mathematics, 28.10.2020 09:40
question
Mathematics, 28.10.2020 09:40
question
Biology, 28.10.2020 09:40
question
Computers and Technology, 28.10.2020 09:40