for the "determine data needs" activity of a project, the optimistic estimated duration is 10 days, the pessimistic estimated duration is 20 days, the most likely time is 15 days. what is the expected duration of completing this activity?
Answers: 3
Physics, 22.06.2019 11:00
What is the measurement of how fast an object moves relative to a reference point?
Answers: 1
Physics, 22.06.2019 12:50
Arunner is jogging at a steady 3.6 km/hr. when the runner is 2.9 km from the finish line, a bird begins flying from the runner to the finish line at 14.4 km/hr (4 times as fast as the runner). when the bird reaches the finish line, it turns around and flies back to the runner. even though the bird is a dodo, we will assume that it occupies only one point in space, i.e., a zero-length bird. how far does the bird travel? (b) after this first encounter, the bird then turns around and flies from the runner back to the finish line, turns around again and flies back to the runner. the bird repeats the back and forth trips until the runner reaches the finish line. how far does the bird travel from the beginning? (i.e. include the distance traveled to the first encounter)
Answers: 2
for the "determine data needs" activity of a project, the optimistic estimated duration is 10 days,...
History, 07.04.2020 03:22
English, 07.04.2020 03:22
History, 07.04.2020 03:22
Spanish, 07.04.2020 03:22
History, 07.04.2020 03:22
Mathematics, 07.04.2020 03:22