subject
Physics, 17.10.2019 18:00 tiffanyrhoda

Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill material will be hauled to the site in 21 cy loose measure trucks. the cycle time for a truck is 40 min. per trip. the swell factor for the earth is 25% and the shrinkage factor is 10%. assume 8 hours per day and a 45-min. effective hour. determine the number of required trucks to complete the project in 32 days.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 19:00
When the velocity of an object is doubled, by what factor is its momentum changed? by what factor is its kinetic energy changed? a) the momentum is zero. b) the momentum is not zero. c) difficult to say.
Answers: 3
question
Physics, 21.06.2019 19:40
Abird sitting high in a tree is an example of what type of wnergy
Answers: 2
question
Physics, 21.06.2019 23:30
Abeam of electrons with of wavelength of 7.5 x 10-6 m is incident on a pair of narrow rectangular slits separated by 0.75 mm. the resulting interference pattern is projected onto a screen 10.0 m from the slits. what is the separation of the interference maxima in the resulting interference pattern?
Answers: 2
question
Physics, 22.06.2019 08:00
Who was the first scientist to measure speed as distance over time?
Answers: 1
You know the right answer?
Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill ma...
Questions
question
Mathematics, 03.02.2021 20:20
question
World Languages, 03.02.2021 20:20
question
Mathematics, 03.02.2021 20:20
question
Mathematics, 03.02.2021 20:20