subject
Physics, 11.10.2019 19:30 gg808

How long does a car (1000 kg) have a speed of 30 m/s from a rest if the engine power is 10kw

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 00:10
The energy released by a chemical reaction can be measured using a calorimeter. when barium hydroxide octahydrate crystals are reacted with dry ammonium chloride inside of a coffee cup calorimeter, the temperature of the 18.00 g of water in the calorimeter decreases from 30.0°c to 8.0°c. the equation for calculating energy absorbed or released by a reaction is: where q is the energy released or absorbed, m is the mass of water in the calorimeter, cp is the specific heat of water, and δt is the observed temperature change. if the specific heat of liquid water is 4.19 j/g·°c, how much energy was absorbed by the reaction?
Answers: 3
question
Physics, 22.06.2019 05:00
When does your body conduct current more readily?
Answers: 1
question
Physics, 22.06.2019 07:50
Determine the fraction of the magnitude of kinetic energy lost by a neutron (m1 = 1.01 u) when it collides head-on and elastically with a target particle at rest which is 21h (heavy hydrogen, m = 2.01 u).
Answers: 3
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
How long does a car (1000 kg) have a speed of 30 m/s from a rest if the engine power is 10kw...
Questions
question
History, 07.05.2021 14:00
question
Mathematics, 07.05.2021 14:00
question
Mathematics, 07.05.2021 14:00
question
Chemistry, 07.05.2021 14:00
question
Mathematics, 07.05.2021 14:00
question
Chemistry, 07.05.2021 14:00
question
World Languages, 07.05.2021 14:00