subject
Physics, 05.11.2019 13:31 stmy1969

Aleaky 10-kg bucket is lifted from the ground to a height of 16 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 48 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 16-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.)

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 00:30
Aball tossed vertically upward from the ground next to a building passes the bottom of a window 1.8 s after being tossed and passes the top of the window 0.20 s later. the window is 2.0 m high from top to bottom. what was the ball's initial velocity? the unit vector j^ is directed upward. how far is the bottom of the window from the launch position? how high does the ball rise above the launch position?
Answers: 1
question
Physics, 22.06.2019 15:50
The california mussel (mytilus californianus) attaches itself to a rock or other solid surface with a bundle of filaments known as the byssus. imagine that 15.0 j of work is done to stretch the distal end of the byssus. it releases 10.8 j of thermal energy as it relaxes. what is the resilience of the distal end of the byssus?
Answers: 2
question
Physics, 22.06.2019 16:00
Why does lightning travel from clouds to the ground?
Answers: 2
question
Physics, 22.06.2019 19:30
Coal contains energy. a. light b. kinetic c. chemical d. mechanical
Answers: 1
You know the right answer?
Aleaky 10-kg bucket is lifted from the ground to a height of 16 m at a constant speed with a rope th...
Questions
question
Spanish, 02.09.2019 01:30
question
Social Studies, 02.09.2019 01:30